مشروع طرق الحدود الصينية الهندية
مشروع طرق الحدود الصينية الهندية India-China Border Roads (ICBR) هو مشروع للحكومة الهندية يهدف إلى تطوير البنية التحتية بحذى الحدود الصينية الهندية ببناء "strategic roads". The Border Roads Organisation (BRO) handles the bulk of the road construction.[1] It has a strength of 32,000, out of which 67% are assigned to ICBR roads.[1] Starting in 1999, out of 61 ICBRs, less than 50% had been completed by the BRO by 2018. However, since 2018, with additional funds the speed of construction has increased. Some of the projects include the Darbuk-Shayok-Daulat Beg Oldie (DS-DBO) road and Rohtang tunnel in the Ladakh; and in the northeast the Sela Tunnel and a tunnel under the Brahmaputra river with Railways.[2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
المرحلة 1
Phase 1 or ICBR-1 project started in 1999[3] with the aim of completing 73 "strategic roads", of approximately 4000 km in length, by 2012.[1] However various delays caused only 22 roads to be complete by March 2016. ICBR-1 was given additional funds in 2018 to complete the road by December 2020.[4] These roads are assigned to various government bodies according to their location - Border Roads Organisation (BRO), Central Public Works Department (CPWD), National Projects Construction Corporation (NPCC), Himachal Pradesh Public Works Department.[4] Funds were also diverted from "General Staff (GS) roads"[أ] to ICBRs.[3]
المرحلة 2
Phase 2 aims to construct 32 roads along the border.[5] In June 2020, amid the India-China skirmishes, the government asked all bodies to speed up the construction of the roads.[5] Additional labour was also sent to these areas to assist in speeding up construction.[5]
ملاحظات
- ^ "GS roads ensure inter-valley and inter-sector movement along the LAC"
المراجع
- ^ أ ب ت Singh, Rahul (2019-02-13). "Speed up road construction along China border: Parliamentary panel asks BRO". Hindustan Times (in الإنجليزية). Retrieved 2020-06-18.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Amid Ladakh standoff with China, India puts border roads in fast lane". Deccan Chronicle (in الإنجليزية). 2020-06-02. Retrieved 2020-06-18.
{{cite web}}
: CS1 maint: url-status (link) - ^ أ ب Gurung, Shaurya Karanbir (2018-04-20). "Shortage of funds delaying strategic roads along China border". The Economic Times. Retrieved 2020-06-18.
- ^ أ ب Singh, Vijaita (2018-03-03). "Govt. puts delayed road projects on Indo-China border on track". The Hindu (in الإنجليزية). ISSN 0971-751X. Retrieved 2020-06-18.
- ^ أ ب ت Singh, Jitendra Bahadur (17 June 2020). "India to accelerate construction of roads along Chinese border: Sources". India Today (in الإنجليزية). Retrieved 2020-06-18.
{{cite web}}
: CS1 maint: url-status (link)