خط أنابيب الغاز العابر للنمسا

(تم التحويل من Trans Austria Gasleitung)
Trans Austria Gas Pipeline
مركز شبكات الغاز الطبيعي في باومجارتن، وهي بداية خط أنابيب الغاز العابر للنمسا
مركز شبكات الغاز الطبيعي في باومجارتن، وهي بداية خط أنابيب الغاز العابر للنمسا
مسار خط أنابيب الغاز العابر للنمسا
الموقع
البلدالنمسا
الاتجاه العامeast-west
منباوم‌گارتن التخوم
يمر عبرEggendorf, Grafendorf, St. Margrethen, Weitendorf, Ettendorf, Waisenberg, Ebenthal, Finkenstein am Faaker See
إلىأرنولدشتاين
معلومات عامة
النوعnatural gas
الشركاءEni, OMV
المشغلTrans Austria Gasleitung GmbH
المعلومات التقنية
الطول380 km (240 mi)
أقصى سعة47.5 billion cubic meters per year

The Trans Austria Gas (TAG) pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System (Süd - Ost - Leitung), which branch-off at Weitendorf.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

تفاصيل تقنية

The pipeline is 380 kilometres (240 mi) long. The original two lines date back to the 1960s, but in 2006 the pipeline was extended by adding the third line. The extension cost US$157 million.[1]

The capacity of the pipeline is 41 billion cubic meters (bcm) of natural gas annually. The construction of two additional compression stations increased the capacity to 47.5 bcm at end 2008.[2]


شركة خط الأنابيب

The pipeline is managed by Trans Austria Gasleitung GmbH (TAG GmbH), a partnership of Eni and OMV. Eni owns 89% of TAG and manages the pipeline, with OMV holding the remainder.[2]

قضية مكافحة الاحتكار

Since 2007, the European Commission has been probing Eni's alleged restrictive practices on the TAG, Transitgas and TENP pipelines by limiting third parties access to the pipelines.[3] The hearing is set for 27 November 2007.[4] To end the case, Eni is studying the possible sale of the pipeline.[5]

المراجع

  1. ^ "Eni, OMV get OK to expand Russia gas line". Offshore247. 2005-06-17. Retrieved 2008-12-07.
  2. ^ أ ب "TAG pipe ready for action". Upstream Online. NHST Media Group. 2006-11-14. Retrieved 2008-12-07.
  3. ^ Paolo Biondi (2009-03-20). "Italy says Eni pipeline case is a security issue". Reuters. Retrieved 2009-11-13.
  4. ^ Foo Yun Chee (2009-11-04). "Eni antitrust hearing set for Nov 27 - EU". Reuters. Archived from the original on January 4, 2013. Retrieved 2009-11-13.
  5. ^ Alberto Sisto (2009-11-06). "Eni may sell TAG pipeline to end EU case - sources". Reuters. Archived from the original on February 1, 2013. Retrieved 2009-11-13.

وصلات خارجية